User Tools

Site Tools


2014:no_estimates_and_probabilistic_planning

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
2014:no_estimates_and_probabilistic_planning [2013/11/04 09:56] jonjagger2014:no_estimates_and_probabilistic_planning [2016/06/11 14:05] (current) – external edit 127.0.0.1
Line 6: Line 6:
 **Duration**: 90 mins\\ **Duration**: 90 mins\\
 **Description**: \\ **Description**: \\
-\\ 
 This year has seen the rise of the noestimates movement. This workshop will explain the arguments for and against noestimates and will tie it into the probabilistic planning techniques that are emerging from the kanban community. This year has seen the rise of the noestimates movement. This workshop will explain the arguments for and against noestimates and will tie it into the probabilistic planning techniques that are emerging from the kanban community.
 \\ \\
-JJ: No duration mentioned in the proposal. I have assumed 90 mins+
2014/no_estimates_and_probabilistic_planning.1383558965.txt.gz · Last modified: 2016/06/11 14:05 (external edit)